bill of quantity for construction of cement

Building Estimation Step by Step In Excel Sheet

Building Estimation Step by Step In Excel Sheet

where is estimation , its only quantity of concrete , how much building material required ? thanks for sharing knowledge . Reply. Krunal Rajput says. 5th November 2020 at 2:34 pm. Thanks, Dear. Reply. Krunal Rajput says. 6th November 2020 at 11:28 am. Nice Articale. Reply. Krunal Rajput says. 6th November 2020 at 11:38 am. Thanks . Reply. vinupradha says. 24th November 2020 at 3:15 pm. Very ...

Get Price
BILL OF QUANTITIES civil and specialist's works for ...

BILL OF QUANTITIES civil and specialist's works for ...

Demolition of floor structure on the ground floor made of plain concrete base d=8 cm, waterproofing and thermal insulation d=5.5 cm, plain concrete d=12 cm, and finish terrazzo floor d=7 cm, removal of debris out of the facility and transport to the building site landfill, and then to the landfill designated by the Investor to 15 kilometers away.

Get Price
Bill of Quantities Example (PDF) + Advantages for a BOQ

Bill of Quantities Example (PDF) + Advantages for a BOQ

03/04/2020  The bill of quantities sometimes referred to as ‘BoQ’ or ‘BQ’ is a document prepared by the cost consultant, often a quantity surveyor, that provides project-specific measured quantities of the items of work identified and respective cost as by the drawings.. A bill of quantities is a document used in tendering in the construction industry in which materials, parts, and labor are itemized.

Get Price
QUOTATION QUOTATION FORFOR CONSTRUCTION OF CONSTRUCTION

QUOTATION QUOTATION FORFOR CONSTRUCTION OF CONSTRUCTION

Bill of Quantity for construction of septic tank, soak pit and inspection chamber at Roida Sl. No. Description of job unit Quantity Rate Amount in Rs./ unit in Rs. 1. Earth work in excavation by mechanical means (Hydraulic excavator) /manual means over areas including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed in all kinds of ...

Get Price
BILL OF QUANTITIES FOR THE PROPOSED YOUTH COMMUNITY

BILL OF QUANTITIES FOR THE PROPOSED YOUTH COMMUNITY

bill of quantities for the proposed youth community center building . summary-- billno -01 total amount 1.00 preliminaries. mvr. - 2.00 excavation and earth work.. mvr. - 3.00 concrete work. mvr. - 4.00 form work mvr. - 5.00 reinforcement mvr. - 6.00 water proofing mvr. - 7.00 masonary work mvr. - 8.00 plastering mvr. - 9.00 flooring tiling mvr. - 10.00 painting mvr. - 11.00 doors windows ...

Get Price
Calculate Quantities of Materials for Concrete -Cement ...

Calculate Quantities of Materials for Concrete -Cement ...

Thus the actual volume of concrete for 1 cubic meter of compacted concrete construction will be = 1 -0.02 = 0.98 m 3. Thus, the quantity of cement required for 1 cubic meter of concrete = 0.98/0.1345 = 7.29 bags of cement. The quantities of materials for 1 m3 of concrete production can be calculated as follows: The weight of cement required = 7.29 x 50 = 364.5 kg. Weight of fine aggregate ...

Get Price
Bill of Quantities - Builders Estimating Bill of ...

Bill of Quantities - Builders Estimating Bill of ...

Bill of Quantities 9 September 2010 Page 3 of 37 Jobexample3Example Renovation Example Renovation Priced Bill of Materials and Labour 5 CONTRACTORS INSURANCE ItemDescription QuantityUnitsRateAmountLvlLd 01611Contractors Insurance for building during 490000/1000$4.50$2,205.00 construction 27 1 Total 5 CONTRACTORS INSURANCE $2,205.00 6

Get Price
Bill of Quantities

Bill of Quantities

Ref Description Quantity Units Rate Value Reinforced concrete Grade C28/35; minimum cement content 280 kg/m3; filled into formwork, laid on 155 mm Cordek (measured separately) A ground beams 62 m3 FORMWORK FOR IN SITU CONCRETE Formwork to foundation and beds Edges and faces of foundations, ground beams and beds: B 500 - 1000 mm high 346 m

Get Price
Bill of Quantities - Estimating Services UK

Bill of Quantities - Estimating Services UK

Ref Description Quantity Units Rate Value IN SITU CONCRETE LARGE PC CONCRETE E10: MIXING, CASTING, CURING IN SITU CONCRETE Plain in situ concrete; mix GEN 1 Filling hollow walls A not exceeding 150 mm thick 9 m3 Plain in situ concrete; mix GEN 3 Steps B generally 6 m3 Reinforced in situ concrete; mix C28/35 src Ground beams and attached pads; poured on or against

Get Price
ABSTRACT OF BOQ

ABSTRACT OF BOQ

BILL OF QUANTITIES Name of work: Construction of (G +5) storied office building (Commercial) Project Location: Deki-lane Phuntsholing Page 2 of 13 BoQ for RICBL, P'ling (civil) Ref.No. Item Description Quantity Unit Rate (Nu) Amount in figure in words C1 Providing and laying in position plain cement concrete excluding the cost of centering and ...

Get Price
BILL OF QUANTITIES FOR CIVIL WORKS FOR 8MW POWER PLANT

BILL OF QUANTITIES FOR CIVIL WORKS FOR 8MW POWER PLANT

BILL OF QUANTITIES FOR CIVIL WORKS FOR 8MW POWER PLANT ITEM Description Unit Quantity (approx) Rate ... PLAIN REINFORCED CEMENT CONCRETES B-1 a) Supplying, laying and compacting plain cement concrete as defined by IS: 456 in all mudmats / leveling courses including filling of loose pockets etc under foundations, pipelines, tunnels, floors etc at all depths below plinth

Get Price
BILL OF QUANTITIES FOR PROPOSED BUILDING CIVIL WORKS

BILL OF QUANTITIES FOR PROPOSED BUILDING CIVIL WORKS

BILL OF QUANTITIES FOR PROPOSED BUILDING CIVIL WORKS AT LITEN 33/11 KV SUBSTATION ITEM NO. DESCRIPTION UNIT QTY UNIT RATE AMOUNT 1 Preliminaries A Allow for a temporary site office adequate to accomondate six persons,notice board, shelves and , store for materials and tools storage. ITEM 1 B Allow for clean water for the works ITEM 1 C Allow for all the necessary

Get Price
05.01. PRICED BILL OF QUANTITIES OF CONSTRUCTION AND ...

05.01. PRICED BILL OF QUANTITIES OF CONSTRUCTION AND ...

PRICED BILL OF QUANTITIES OF CONSTRUCTION AND FINISHING WORK BUILDING: Reconstruction of Obrenovac Grammar School INVESTOR: Republic of Serbia. Obrenovac Grammar School FAÇADE AND ROOF A. CONSTRUCTION WORK I PREPARATORY AND DEMOLITION WORK UoM QUANTITY PRICE SUBTOTAL 1.1. Mounting and dismounting of the façade metal scaffolding

Get Price
Bill of Quantities - BuildingWorks

Bill of Quantities - BuildingWorks

Bill No. 5 Precast concrete £70.67 Bill No. 6 Masonry £31,566.68 Bill No. 7 Carpentry £10,281.72 Bill No. 8 Sheet roof coverings £599.79 Bill No. 9 Tile and slate roof and wall coverings £15,427.20 Bill No. 10 General joinery £1,545.26 Bill No. 11 Windows, screens and lights £17,675.61 Bill No. 12 Doors, shutters and hatches £4,090.66 Bill No. 13 Stairs, walkways and balustrades £ ...

Get Price
BILL OF QUANTITY FOR CONSTRUCTION OF CEMENT CONCRETE ...

BILL OF QUANTITY FOR CONSTRUCTION OF CEMENT CONCRETE ...

BILL OF QUANTITY FOR CONSTRUCTION OF CEMENT CONCRETE PAVEMENT PADESTRIAN PATHWAY NEAR BRT BUS PICK UP POINT AT OLD MANTRALAY (DKS BHAWAN) RAIPUR NOTES TO BILL OF QUANTITIES All drawings to be studied carefully before quoting rates All works shall be executed as per relevant specifications/codes and to the best of the Engineering practices Rates shall

Get Price
Billing of Quantities (BOQ) Types Example BOQ ...

Billing of Quantities (BOQ) Types Example BOQ ...

04/07/2019  Calculation of materials for Reinforced Concrete Construction . Materials requires for reinforced concrete are cement, sand, coarse aggregate and steel.Let us assume a standard quantity of 1m 3 Cement mortar and a mix proportion of 1:1.5:3 (1 part Cement, 1.5 parts Sand 3 parts CA). The quantity can preferable calculated by two methods, which are weight volume method.